Choosing Materials for a Home Addition or New Build in Southeast Michigan: What to Decide, and When

Ask someone what choosing home addition materials involves and they will usually describe a showroom trip. Tile samples on a table, a few cabinet doors leaned against the wall, a debate about brushed nickel. That part is real, and it can be fun. On an addition or a new home, though, it comes late in the process, and it is rarely where the expensive mistakes get made.

The costly ones happen months earlier, often before anyone has used the word “materials.” A window size gets drawn on an elevation. A wall thickness gets picked by default. A shower valve gets roughed in before anyone decides what kind of shower it will be. By the time the homeowner is choosing finishes, a lot of the important choices have already been made, sometimes by nobody in particular.

We already keep a list of the materials and brands we build with, from CertainTeed roofing and siding to AZEK trim and Schluter waterproofing. This post covers the other half of the question: how those choices actually get made on an addition or new build, the order they have to happen in, and why an addition and a new home present such different problems.

Why the order of decisions matters

Construction runs in a fixed sequence. Foundation, then framing, then the mechanical rough-in, then insulation and drywall, then finishes. You can see the full version on our Residential Project Roadmap. Every material decision is tied to one point in that sequence, and that point is where the decision stops being cheap.

Before that point, changing your mind costs a revised drawing or a conversation. After it, the same change can mean opening a wall, re-ordering a window, or re-submitting plans. A homeowner who switches from a standard tub to a freestanding one during finish selections is asking the plumber to move a drain that was set weeks ago. Nobody did anything wrong. The decision just arrived after its deadline.

So the most useful way to think about materials on a large project is as a calendar. Here is roughly how ours runs.

The material decision calendar

While the drawings are still being drawn

These are the choices that shape the structure and the permit set. They are also the ones homeowners are least likely to realize they are making.

  • Wall assembly and insulation approach. How thick the exterior walls are and where the insulation sits affects window jamb depth, trim details, and how the new walls meet the old ones on an addition. It is also the hardest thing in the house to upgrade later.
  • Window type, size, and material. Windows appear on the elevations, so they are effectively chosen when the drawings are. Operating style (double hung, casement, slider) matters here too, for egress and for how the windows will look next to existing ones.
  • Roof pitch and roofing material. On an addition, the new roof has to tie into the existing one. On a new build, a heavier roofing material can change what the framing has to carry.
  • Exterior cladding. The siding choice drives the trim details, the corner treatments, and how water is managed behind the wall.
  • Floor and ceiling heights. On an addition especially. Where the new floor lands relative to the existing one determines whether you get a clean transition or a step, and the finished flooring thickness on both sides is part of that math.

If your property is in one of Ann Arbor’s local historic districts, this stage carries extra weight. The Historic District Commission’s application checklist for additions asks for proposed materials, trim dimensions, and window cut sheets up front, which means those choices are made before the project can even be reviewed. More on that below.

Before permits are approved

Windows, exterior doors, and other custom or special-order components have the longest lead times on most projects. Ordering them before permits come back, so they arrive around the time framing wraps up, is one of the simplest ways to keep a project from stalling. We cover the permit side of this timeline in our post on permitting a new home in Washtenaw County.

The practical consequence for homeowners: window and door decisions need to be final earlier than almost anything else. Color, hardware finish, grille pattern, all of it.

Before framing is finished

This is the deadline people miss most often, because the items involved feel like finishes. They are finishes, but they need something inside the wall.

  • Plumbing fixtures. Shower valves, body sprays, a wall-mounted faucet, a freestanding tub, a wall-hung toilet that needs an in-wall carrier. Each one sets where pipes and drains go.
  • Tile shower layout. A curbless entry, a linear drain, or a built-in niche all change the framing and the waterproofing approach. Our bathroom work uses Schluter systems in wet areas, and the layout needs to be settled before that system goes in. Our bathroom remodeling guide goes further into this.
  • A range hood needs a duct path. Induction cooking may need different electrical capacity than gas. A built-in refrigerator needs a specific opening.
  • Solid wood in the wall behind wall-hung cabinets, a mounted TV, floating shelves, or future grab bars. Adding blocking now costs very little. Adding it after drywall means cutting drywall. If aging in place is on your radar at all, our aging-in-place planning guide covers what to build in now.
  • Lighting layout. Fixture locations, recessed lighting, under-cabinet lighting, and switch locations. The fixtures themselves can wait. Their locations cannot. Our room-by-room lighting guide is a good place to start thinking about this.

Before drywall

Last call for anything in the walls: low-voltage wiring, speaker wire, network cable, and any remaining blocking. Insulation is installed and inspected at this stage too, which is why the wall assembly decision from the drawing stage matters so much. Once the drywall is up, that choice is permanent for practical purposes.

During the finish phase

Paint colors, cabinet hardware, light fixture styles, plumbing trim finishes, and most flooring choices land here. This is where the showroom trips belong, and where changing your mind is usually affordable. One caveat: the flooring product can be chosen late, but its approximate thickness should be known back at the drawing stage, especially on an addition where new floors meet old ones.

Home addition materials: the matching problem

An addition has a challenge a new build doesn’t. Every material you choose has to sit next to a material that has been aging in place for decades.

Even when the original product is still manufactured, it won’t look identical on day one. Vinyl siding fades with sun exposure, and the side of the house that faces south has usually faded more than the north side. Asphalt shingle colors get discontinued. Siding profiles change: a 4-inch clapboard exposure and a 5-inch exposure look similar in a catalog and obviously different on a wall. Brick is its own puzzle, with color, size, and mortar joint all varying from one era to the next.

There are three realistic ways to handle this, and the right one depends on the house, the budget, and how visible the addition is from the street.

  • Match as closely as possible. This works when the existing product is still available and the addition is on a less visible side. Painted wood or fiber-cement siding is the easiest to match, since the whole elevation can be repainted together.
  • Re-side the elevation, or the whole house. If the existing siding is near the end of its life anyway, folding a full re-side into the project often costs less than people expect relative to the result, and it removes the matching problem entirely. It is worth pricing before ruling it out.
  • Choose a deliberate contrast. A different but compatible material on the addition, such as shake-style siding on an addition to a clapboard house, or a different trim width. This can look great, but only when it is planned as a contrast from the start. Picked late in the project, it tends to read as a mismatch.

The worst outcome is the one nobody chose: close-but-not-quite siding that makes the addition look like a repair. That usually happens when matching is treated as a finish-stage problem instead of a design-stage one. We touched on this in our broader guide to what to expect when adding on to your home, and it is worth repeating: the addition should look like it belongs, and that is decided on paper.

If you live in an Ann Arbor historic district

Ann Arbor has fifteen local historic districts, and exterior work in them is reviewed by the Historic District Commission. For additions, the commission’s own checklist turns the usual matching logic around. It asks that materials and trim on the addition be slightly different from the historic house, in size or material, so the old and new parts can be told apart. Windows are typically expected to be wood or clad wood, with cut sheets submitted as part of the application.

In practice, that means you are designing a deliberate contrast whether you planned to or not, and the material choices have to be settled early enough to go into the application. You can check whether your address is in a district on the city’s historic preservation page before design work starts.

Inside, where old meets new

The interior seam deserves the same attention. Older homes in this area often have trim profiles, door heights, and wall thicknesses that don’t match anything sold today. Plaster walls are thicker than drywall. Original hardwood may be a species or width that takes some hunting to find. Deciding early whether the addition’s interior will match the existing house or set its own character keeps the doorway between them from becoming the most awkward spot in the home.

Second-story additions have their own version of all this, since nearly every exterior surface is affected. Our post on building up with a second-story addition covers the structural side.

New builds: choosing for decades of Michigan weather

A new home has no existing house to match, which sounds simpler. The trade-off is that every choice is yours, and the ones that matter most for the next thirty years are mostly invisible once the house is finished.

Washtenaw County sits in climate zone 5A under the energy code. In plain terms: cold winters, humid summers, and a lot of freeze-thaw cycling in between. That combination is hard on anything that absorbs water, anything that can’t tolerate movement, and any roof edge where ice can build up.

Spend where it is hard to go back

A useful rule on a new build: put the money where a later upgrade would mean tearing something apart. Countertops, light fixtures, and paint can all be changed in a weekend or a week. Wall insulation, air sealing, windows, the roof assembly, and the foundation drainage cannot, at least not without a major project.

The energy code sets a floor for some of these, and it is worth knowing that the floor is currently older than many people assume. Michigan filed an updated residential energy code based on the 2021 national model code in 2025, but a court order in July 2025 paused it while a lawsuit from builder groups plays out. While that pause is in effect, the 2015-based residential provisions remain the standard. Whatever the outcome, the code describes the minimum a house can legally be built to. Our How We Build page explains why we spec insulation, windows, and foundations to the climate instead of to that minimum.

Roofs and the ice-dam edge

Michigan roofs need an ice barrier membrane along the eaves, extending at least 24 inches inside the exterior wall line, to keep meltwater that backs up behind ice from getting under the shingles. Deep overhangs or low roof pitches push that membrane farther up the slope. Valleys, wall intersections, and penetrations around chimneys and vents need equal care. We use CertainTeed roofing systems, and the details at those edges matter as much as the shingle itself. Our post on making a home more storm-resilient covers roof-edge fastening and flashing in more depth.

Trim, decking, and the materials that move

We use AZEK PVC trim and decking because it doesn’t absorb water, which means it won’t rot and paint holds up on it far longer than on wood. The detail most people never hear about: PVC expands and contracts with temperature. The manufacturer’s installation guide calls for fastening along the full length and leaving a specific allowance for movement on long runs, and it warns that darker colors move more. Installed correctly, the joints stay tight through a Michigan January and a July heat wave. Installed like wood, they open up within a year.

That is a good example of why material choice and installation can’t be separated. A premium material with the wrong installation detail performs like a cheap one.

Moisture inside the house

Tight, well-insulated houses handle moisture differently than the drafty homes many of us grew up in. Wet-area waterproofing, bathroom and kitchen ventilation, and the vapor control layer in the walls all have to be chosen together. We wrote a full post on indoor humidity in Southeast Michigan homes if you want to go deeper on why this matters here specifically.

Questions to bring to your first design meeting

Whether you are adding on or building new, these questions will tell you a lot about how a contractor approaches materials:

  • Which of my material decisions need to be final before drawings go to permit, and which can wait?
  • Which items have the longest lead times right now, and when will you order them?
  • What is the wall assembly, and how does it compare to the code minimum?
  • For an addition: how will the new siding, roofing, and trim relate to what is already on the house, and what are my options if an exact match isn’t available?
  • Who is responsible for making sure the window installer, the siding crew, and the trim carpenter are working from the same details?

That last question matters more than it looks. On a project with several trades, the places where one material meets another (window to siding, siding to trim, roof to wall) are where water gets in. Someone has to own those transitions. On our projects that is our job as the general contractor, and it is a big part of how we coordinate trades.

How material selection works with FCG

We start material conversations during pre-construction, well before anyone visits a showroom. We walk through the decision calendar for your specific project, flag which choices are due before drawings and permits, and get long-lead items ordered on time. On additions, we look closely at the existing house first, so the matching approach is decided while it is still cheap to decide. You can see how this fits into the rest of the process in What to Expect When You Build With FCG.

If you are planning an addition or a new home in Ann Arbor, Dexter, Chelsea, Saline, Brighton, or elsewhere in Washtenaw County, schedule a free consultation. Bring your plans, your photos of the existing house, or just the idea. We’ll help you figure out which decisions are coming first.

Sources:

    Your Trusted Southeast Michigan General Contractor

    At Fletcher Contracting Group, we help homeowners across Ann Arbor, Dexter, Chelsea, Saline, and Brighton bring their architectural and design plans to life. From home additions and renovations to complete construction management, our team ensures every project is delivered on schedule, on budget, and with lasting quality.

    Ready to expand your home’s possibilities?
    Schedule a free consultation today to discuss your second-story addition in Southeast Michigan.

    Fletcher Contracting Group — You bring the plans. We’ll build it right.

    “I rarely leave reviews, but working with Jerome was a truly great experience.  With the advent of remote work, I needed a dedicated office space.  He identified open space in the garage that if converted into a partial second story, would save money on building an entirely new structure.  It’d also maintain the design integrity of my home.  I now have a private workspace with a 1/2 bath that’s far better than expected.  Overall, he & his team were responsive, helpful & results-oriented.  Call Jerome.  He’s one of the few who still care.” – H.B., Dexter

    “Went from a terribly outdated bathroom with a single sink and CARPET to a tiled jack & jill with a modern, clean aesthetic.  Jerome suggested opening a wall for a doorway & now my 2 growing sons have their own entrance from their bedrooms.  So practical – and so much less bickering.  Thanks Jerome.  You guys are fantastic!” – Janie A., Ann Arbor